Inter-State Connectivity (ISC)
Sl. No Name of Project Length (Km) Sanction Cost (In Cr) Date of Sanction
1 Construction of road from Tizit to Nokzang via Yanpan, Sakho and Laukun, (Total Length-32.60km) under Centrally Sponsored scheme of Inter-State Connectivity (ISC) in the State of Nagaland. (Job No: ISC-NG-2010-11-11) 32.60 34.78, 25.11.2010  
1 Construction of two lane Bridge over river Dhansiripar at Assam Border in Dimapur District in the State of Nagaland under Centrally Sponsored Scheme of Inter State Connectivity. (Job No ISC-NG-2014-15/14) 0.125 19.8 06.06.2014
2 Construction of road from Longwa (ITC) Nagaland to Pongchau Town, Arunachal Pradesh in the state of Nagaland under Centrally Sponsored Scheme of Inter State Connectivity. (Job No ISC/NG/2014-15- 15) 30.00 36.0013 28.10.2014
3 Construction of Capital Bypass road (Kohima-Dimapur)      
Package – I (Km 0.00 to Km 11.00) (11.00km) 11.00 346.69 05.07.2017
Package – II (Km 11.00 to Km 23.00) (12.00km) 12.00
Package – III (Km 23.00 to Km 34.171) (11.171km) 11.171
4 Construction of 2 Lane Inter State Connectivity Road from Chizami Jn. at Km 102 on NH-29 Nagaland to Manipur/Nagaland border on Chizami to Lai Manipur section in State of Nagaland under ISC scheme during 2017-18. Length-8km. (Job No: ISC/NG/2017-18/22) 8.00 28.8 20.01.2017
5 Upgradation of road to 2 Lane from Dhobinalla Junction to Diphu, Assam road length 8km via Thahekhu Ranghapahar crossing and Sangtamtilla under ISC Scheme I the state of Nagaland during 2017-18 Length-8km. (Job No: ISC/NG/2017-18/23) 8.00 19.25 25.04.2017
6 Construction of 2 Lane with paved shoulder from Tizit to Zangkham – Pumao via Sangsa { Phase-I: from Tizit (Km 0) to Zangkham (Km 20)}under ISC Scheme for the State of Nagaland during the year 2017-18 (Job No: ISC/NG/2017-18/28) 20.00 84.85 30.10.2017
Central Road Fund (CRF)
Sl. No Name of Project Length (Km) Sanction Cost (In Cr) Date of sanction
1 Construction of RCC Girder bridge over Dhansiri river at Nagarjan under Dimapur, Nagaland under Central Road Fund (CRF) Job No. CRF/NG/2015-16/021. 0.12 37.95 28.07.2015
2 Construction of RCC Girder bridge over Chathe Diphupar B behind Referral hospital Dimapur under CRF. Job No. CRF/NG/2015-16/019. 0.12 37.66 28.07.2015
3 Construction of Flyover bridge at Kuda-Thahekhu under CRF in the state of Nagaland. Job No. CRF/NG/2015-16/026 0.516 63.92 29.12.2015
4 Construction of road from Suruhuto to Asukhomi (Length 15 km under CRF scheme in the state of Nagaland. Job No. CRF/NG/2017-18/036 15.00 16.49 11.08.2017
5 Construction of RCC Girder bridge over Nanga River between Kisakita and Suruhuto. Job No. CRF/NG/2017-18/033 0.025 8.8 19.12.2016
6 Upgradation of road from Border road Naghuto New to Pukhobokita on Coco Doyang road Length 10 km under CRF scheme in the state of Nagaland. Job No. CRF/NG/2017-18/035. 10.00 12.00 11.08.2017
7 Construction of Bailey Bridge over Kilki river under CRF in the State of Nagaland during 2015-16. Job No. CRF/NG/2015-16/031. 0.03 6.82 08.01.2016
8 Construction of Girder Bridge at Tulo River under Zunheboto District under CRF in the State of Nagaland during 2015-16. Job No. CRF/NG/2015-16/029 0.04 11.46 08.01.2016
9 Construction of RCC Bridge over Doyang River under Zunheboto District under CRF in the state of Nagaland during 2015-16. Job No. CRF-NG-2015-16-030 0.06 14.50 08.01.2016
10 Upgradation of road from Chozuba town to PWD Office voa Police Station, Telecom, Veterinary and Agri Office at Lower PWD, SDO’sOffice to Eastern Christian English School to Yorubami-Ghanumi Junction. Job No. CRF/NG/2015-16/024 9.50 22.42 28.12.2015
11 Upgradation of road from Satheri to Chepokita under Phek District, Nagaland . Job No. CRF/NG/2013-14/017 22.00 21.7 17.02.2014
12 Construction of road from Yaong to Yangpi via Dikhu Bridge Point at Salalumang road Mongtikang, Pongching and Longra under Longleng (35.00 km) under CRF scheme in the State of Nagaland during 2016-17. Job No. CRF/NG/2016-17/034 35.00 36.66 19.12.2017
13 Construction of RCC Bridge (20m span) over Khughu River under CRF during 2016-17 in the State of Nagaland (5th call) Job No. CRF/NG/2016-17/032 0.02 12.00 19.12.2016
14 Construction of road from Khuzama OC HQ to Kezocha Administrative HQ (15 km ODR) under Kohima District under CRF in the state of Nagaland during 2015-16. Job No. CRF/NG/2015-16/025 15.00 24.00 29.12.2015
15 Construction of new 4 Lane bridge over river Sonorou at Kohima under CRF in the State of Nagaland during 2015-16. Job No. CRF/NG/2015-16/027 0.045 20 29.12.2015
Economic Importance (EI)
Sl. No Name of Project Length (Km) Sanction Cost (In Cr) Date of Sanction
1 Construction of intermediate lane road from Yongnyah EAC Hq. to 186 MW Dikhu Hydro Project (length 22km) under EI Scheme in the state of Nagaland. (Job No. EI/NG/2018-19/29) 22.00 74.066 30.01.2019
2 Construction of Road from Kijumetouma to Kughu river via Iphonu, Ghathashi, Mukali, Shesulimi and Kichilimi (Phase-II from Ghathashi to Tsui River), Length-17km (Job No: EI/NG/2017-18/27) 17.00 49.88 30.10.2017
3 Construction of 2 lane road from Kikheyi village-Tohokhu-Aghunaqa HQ road under EI Scheme in the State of Nagaland during 2017-18. (Job No: EI/NG/2017-18/24) 35.00 47.69 25.04.2017
4 Construction of road from Akuluto town to Mukhami (NH-61) via Tishi valley, Lotisami, Lotisami Old, Lotisami New village (32 km) under Economic Importance (EI) Scheme during 2015-16 for the State of Nagaland. (Job No: E&I/NG/2015-16/017) 32.00 40.00 31.03.2016
5 Construction of road from Kijumetouma to Ghathashi via Phuyeqa, Chishiqa and Tukuliqa including 02 (two) No.s of 25 meters span bridge under E&I scheme during 2016-17 for the State of Nagaland. (Job No: E&I/NG/2016-17/019) 26.00 49.96 11.05.2016
NLCPR
Sl. No Project Length (in km) Sanction Amount Sanction Date
1 Upgradation of Road from Alongchen to Mangkolemba via Impur, Mopungchuket, Mongchen (ODR to MDR)-19 km (Ph-II) 19.00 2233.00 25.05.2017
2 Construction of road from Chen Hq. to Wangti 23.10 km in Mon District

 

23.10 2450.59 7/8/2013
3 Constn of Road from Jendang-Saddle-Noklak-Pangsha, Tuensang District-62 km (Phase-II for 31 km) in Nagaland

 

31.00 2186.72 12/26/2012
4 Constn of Road from Kohima to Leikie road jn to Barak-15 km (Phase-III)
15.00 1911.48 12/26/2012
5 Construction of road from Kohima-Leikie road junction to Tepuiki to Barak. (MDR) Ph-II (15km to 25 km). 10.00 968.54 2/28/2011
6 Construction of road from Noklak to Thonoknyu via Sanglao in Nagaland.
14.50 2249.38 21.01.2014 (revised)
NORTH EAST ROAD SECTOR DEVELOPMENT SCHEME (NERSDS) FUNDED BY NEC
Sl.
No.
Name of the project Length (Km) Sanction Amount (Rs. In Crore) Sanction Date
1 Dikhu Bridge to Amguri in Mokokchung District in Nagaland 17.16 59.77 05.08.2019
2 Up Gradation of AT Road from Tsusangra to Impur including 3 Nos. bridges in Nagaland 26.34 93.98 05.08.2019
3 Tening to Lekie in Nagaland 37.50 136.96 05.08.2019
4 Rehabilitation and Up gradation of road from Tuensang to Longleng – 51.60 Km 51.60 188.61 05.08.2019
5 Up Gradation of road from Chendang Saddle to Noklak road. 17.19 62.2 24.03.2021
  TOTAL 149.79 541.52  
NORTH EAST SPECIAL INFRASTRUCTURE DEVELOPMENT SCHEME (NESIDS)
Sl.
No
Name of the project Length (Km) Sanction Amount (Rs. In Crore) Sanction Date
1 Construction and widening of roads from NH-29 to Sovima Village gate -Sovima Cricket ground upto Thahekhu Village, Dimapur 8.50 2196 29/08/2019
2 Upgradation of Road from Wokha HQ to N. Longidang 21.00 2289.90 29/08/2019
3 Up-gradation of road from Naga Lempong to Ahom Cave trekking point at Longleng District 7.43 1299.43 8/29/2019
4 Upgradation of road from Kiphire to Tourist destination at Zungki river, Kiphire district 8.85 2044.32 30/08/2019
5 Providing connectivity to places of Tourist interest in the district HQ of Tuensang District 10.50 2538.86 30/08/2019
6 Upgradation of road and construction of bridge from NH 29 at 7th Mile Model Village to Seithekima C Tourist Destination upto Nuiland Road towards Governors Camp 8.40 3289.27 7/10/2019
7 Development of Tourism related infrastructure at Tuophema Tourist Village 7.68 1713.21 7/10/2019
  Total 72.36 ₹ 15,370.99  
PROJECTS UNDER DEVELOPMENT SR 2020-21
Sl. No Name of Work Length
(km)
Sanctioned Amount
(Rs in Lakhs)
Sanction Date
1 Improvement of Approach road form Molnom to Khaibun Vilage and Socunoma to Chathe Prayer Center 2.50 83.09 05.02.2021
2 Improvement of road form BRO to Jakpang village-1Km 1.00 80.00 05.03.3021
3 Construction of road from Secretariat Road (Near vuto Motors) to Zienuobadze Highschool Colony in Kohima 1.50 130.53 08.03.2021
4 Improvement of Jakhama Village Road form NH-2 1.50 106.58
08.03.2021
5 Improvemen of Kitsubouzo Approach Road 0.34 62.89
08.03.2021
6 Special Road Development Programme ( SRDP) covering the entire State   1275.00 09.10.2020
PROJECTS UNDER NON DEVELOPMENT 2020-21
Sl. No Name of Work Length
(Km)
Sanctioned Amount
(Rs in Lakhs)
Sanction Date
1 Annual Maintenance ( covering all 24 Division of PWD(R&B))   3400.00 20.11.2020
2 Upgradation of road form Botsa (NH-2) to Touphema (Tourist Village )Length 5Km . 5.00 598.95 04.02.2021
3 Composite Retaining Wall on NHAK to Tinpati road near Zeme Babtist Chruch. 90.00 (m) 48.85 01.03.2021
4 Construction of culvert at Tsupaksa Sector Yimchalu . 7.00 (m) 12.00 01.03.2021
5 Improvement of Kacharigaon road. 0.246 14.00 01.03.2021
Scheme for Special Assistance to States for Capital Expenditure during 2020-21
Sl. No Name of Work Length
( Km)
Sanctioned Amount
(Rs in Lakhs)
Sanction Date
1 Construction of road from New Changsu to Wokha-Merapani road Junction – 8Kms. 8.00 1300.00 16.11.2020
2 i). Restoration and upgradation of road from NH2 Viswema to Pfutsero via Zuketsa – 32 Kms. (Group-A) 17.00 1500.00
ii). Restoration and upgradation of road from NH2 Viswema to Pfutsero via Zuketsa – 32 Kms. (Group-B) 15.00
3 Improvement of road from BRO road Junction via Satami Village to Asuto EAC Hqtrs (15 Kms) 15.00 1000.00
4 Upgradation of road from NH2 to Viphoma connecting Dimapur-Kohima Bypass road via Zhadima Village (Phase-I – 13.2 Km) (25 Kms) 13.20 2000.00
5 Improvement of road from Clark Theological Collge Mokokchung (CTC) to Kubza Mokokchung 15 Kms and Improvement of road from Zunheboto Jn. to Alichen via Setrsu Village Mokochung. 12.40 1000.00
6 Improvement of from Longching to Sowa Janli. 12.00 980.00
7 Improvement of road from Jotsoma By Pass Road to Kohima & Improvement of Laike Road. 11.40 1433.00
8 Improvement of road from 4th NAP Gate to Thizama Village Gate. 2.65 410.00
9 Construction of road from NH-29 to Sovima Village Circular road Junction via ICFAI University. 2.30 490.00
10 Improvement of road from Central Jail (4th Mile) to Dzubza bridge, Niuland (22 KM),
22.00 1010.00
11 Boundry Demarcation and constructin of approach road at Proposed Chiethu Airport (Construction of Appraoch raod to Chiethu airport) 8.00 630.00
PMGSY -I Phase-VIII
Sl.
No.
Name of the Work Length
(in Km)
Sanction Amount Sanction date
1 Ketsapo to Metsale 20.00 824.06 2/22/2012
2 Nokhu to Choklangan 35.00 1286.44 2/22/2012
3 Jalukie – Khelma road (L-021) to New Nkio 27.00 985.53 2/22/2012
4 JA road -Khelma to Ikesingram 14.00 486.61 2/22/2012
5 Lalong to Nzauna 15.00 534.43 2/22/2012
6 Ngam to Lalong 13.00 523.51 2/22/2012
7 Mimi to Khonga and Hakumuti 42.00 1568.29 2/22/2012
PMGSY-I Phase-IX-Batch I
Sl. No Name of the Work Length
(in Km)
Sanction Amount Sanction Date
1 T-01 to Khong 9.00 538 27.07.2017
2 L-021 to Suthotsu 21.20 1306.01 27.07.2017
1 Thezatse to Kizari 19.00 1305.48 27.07.2017
2 T-01 to Thetsumi 11.00 785.24 27.07.2017
3 T-01 to Kanjang 38.00 2679.04 27.07.2017
4 Satakha to Momi 4.20 225.59 27.07.2017
5 Satoi to Ikiye via Itovi 11.60 437.19 27.07.2017
6 Satoi to Tsuruhu 5.20 352.47 27.07.2017
9 Achikuchu to Yevishe via Yeshito 12.00 770.09 27.07.2017
7 Yeshito to Kikhevi via Kathara 18.00 1130.5 27.07.2017
11 Tokiye to Thokihimi 12.00 732.67 27.07.2017
12 Niuland to S. Hetoi 9.00 612.22 27.07.2017
13 Tsosinyu to Longwesinyu 10.00 653.53 27.07.2017
8 T-02 to Thekhrejuma via Sirhima 17.00 1234.91 27.07.2017
9 T-01(NH-29) to Kidima via Viswema 14.50 1012.66 27.07.2017
16 L-021 to Longlim 1.00 65.77 27.07.2017
17 L-025 to Tela 5.00 287.52 27.07.2017
10 Yangkhao to Shingnyu 25.00 1709.48 27.07.2017
11 KL Road to Bamsuilkelwa via Old Ngaulong 21.00 1381.32 27.07.2017
PMGSY-I Phase- IX-Batch II
Sl. No Name of the Work Length
(in Km)
Sanction Amount Sanction Date
1 L-034 to Old Amboto 25.00 2457.36 05.12 2018
2 L-025 to Sungkha 30.00 2571.82 05.12 2018
3 L-025 to Pangtong 12.00 917.14 05.12 2018
4 Governor’s Camp to Koro 8.48 573.96 05.12 2018
5 L-026 to Sangtsong 16.00 1662.33 05.12 2018
6 L-022 to Shishimi 20.00 1889.38 05.12 2018
7 L-023 to Insikiur 10.00 860.57 05.12 2018
8 L-023 to Aniakshu 14.60 1445.4 05.12 2018
9 T-01 to Wansoi 8.00 878.94 05.12 2018
9 BRTF – Aosungkum via Aosenden 9.00 600.61 05.12 2018
10 BRO rd to Thezatse 9.00 589.32 05.12 2018
11 Wazeho to Mollen 10.20 572.45 05.12 2018
12 Lanye Bridge to Losami 13.80 1028.94 05.12 2018
13 BRO road to Khuvuxu 12.00 726.6 05.12 2018
15 Phesama to Pfuchama 4.50 280.35 05.12 2018
14 Botsa to Chakhabama 30.00 1462.68 05.12 2018
17 T-01 to Khriezephe 7.00 489.66 05.12 2018
15 L-026 to Kendong 7.50 591.95 05.12 2018
16 T-02 to Nsenlwa 14.00 1211.94 05.12 2018
Bridges
Sl. No Name of the Work Length
(in m)
Sanction Amount Sanction Date
1 Dzudza River
(NH 39 to Viphoma)
45.72 310.95 05.12 2018
2 Chathe River
(Thekrejuma via Seirhima)
21.34 142.96 05.12 2018
  Langlung River
(Dhansiripar to Zutovi)
45.72 301.98 05.12 2018
3 Nzu River
(Tseminyu (S) to Tsosinyu)
42.67 314.76 05.12 2018
4 Nru River
(Tseminyu (S) to Tsosinyu)
45.72 318.86 05.12 2018
5 Mulotiru River
(Phek- Ketsapo road)
36.58 278.98 05.12 2018
6 Laka River
(Ketsapo to Metsale)
15.00 114.52 05.12 2018
7 Walazuh River
(Wazeho to Mollen (NC))
30.00 230.26 05.12 2018
8 Chokla River(Middle)
(Thoktsur to Pang road)
42.67 345.59 05.12 2018
9 Chokla River(Lower)
(Thoktsur to Pang road)
24.38 182.06 05.12 2018
10 Choklo River(Upper)
(Thonok- Sanglao rd to Kenjong)
36.58 294.02 05.12 2018
11 Sukong River
(Thonok- Sanglao rd to Kenjong)
30.48 218.94 05.12 2018
12 Jongmoti River
(Thonok- Sanglao rd to Kenjong)
30.48 241.09 05.12 2018
13 Leamong River
(Nokhu bridge junction to Langnok)
27.43 201.25 05.12 2018
14 Leamong River
(L-023 to Aniashu (NC))
30.00 229.07 05.12 2018
15 Langyoung River
(Yimpang to Taknyu)
30.48 240.60 05.12 2018
5 Yayi-Shipong River
(Shiponger to Kuitsuker)
30.48 226.52 05.12 2018
Noksenung Nallah River
(Kephore to Shiponger road)
15.24 119.88 05.12 2018
16 Yangri River
(L-025 to Sarika A&B)
36.58 263.28 05.12 2018
17 Otchutsupho River
(Sumito to Akakito)
15.24 113.68 05.12 2018
18 Tchuyimo River
(Sumito to Akakito)
15.24 111.61 05.12 2018
15 Sathaka River
(Governor’s Camp to Koro (NC))
25.00 163.22 05.12 2018
19 Yangru/Bazar River
(Merapani – Suphayan to Pangtong)
25.00 162.93 05.12 2018
20 Tchutso River
(Merapani – Suphayan to Pangtong)
30.00 230.45 05.12 2018
21 Sorai River
(L-034 to Amboto)
30.00 211.88 05.12 2018
22 Alirak River
(L-025 to Sungkha (NC))
25.00 184.05 05.12 2018
23 Azukikhi River
(Khuvuxu to Tsutoho )
15.24 118.11 05.12 2018
24 Aphughoki River
(BRO road to Khuvuxu)
15.24 114.28 05.12 2018
22 Karicho River
(Yazashi to Tsuko (O))
21.34 156.88 05.12 2018
25 Lizuki River
(Satami to Lizutomi )
15.24 111.86 05.12 2018
26 Saikha River
(Satami to Lizutomi )
15.24 109.30 05.12 2018
27 Tepunki River
(LK road to Bamsiakilwa via Old Ngaulong)
27.43 201.12 05.12 2018
28 Nsenki River
(JA road/Khelma to Ikisingram)
21.34 159.37 05.12 2018
29 Magaki River
(Ngam to Lalong)
30.48 212.32 05.12 2018
30 Tuikuki River
(Jaluki-Athibung road (L-021) to New Nkio)
21.34 153.12 05.12 2018
31 Nsenki River
(T-02 to Nsenlwa (NC))
20.00 152.06 05.12 2018
9 Tuko River
(Shetap to N/Ching (NC))
15.60 123.01 05.12 2018
Baji River
(Pongo-Yonpang road to Mongtikang (NC))
24.38 185.48 05.12 2018
32 Zunki River
(Kuisam to Sangkumti via Mutanger(NC))
51.82 450.45 05.12 2018
33 Likhimro River
(Pungren-Mimi road to Fakim via Penkim)
24.38 198.00 05.12 2018
34 NyuPongthsongki River
(L-022 to Tsunger)
15.24 124.69 05.12 2018
35 Yansethsaki River
(L-022 to Tsunger)
15.24 122.63 05.12 2018
36 Kithrila River
(L-022 to Tsunger)
15.24 119.46 05.12 2018
37 Pamshang River
(Kichang to Hutanger via Horonger)
24.38 203.74 05.12 2018
38 Youthku River
(Kichang to Hutanger via Horonger)
  117.61 05.12 2018
39 Khipyung River
(Kichang to Hutanger via Horonger)
  202.63 05.12 2018
40 Pantong River
(L-022 to Shishimi (NC))
  168.74 05.12 2018
41 Likhimro River
(L-026 to Sangtsong (NC))
  145.95 05.12 2018
PMGSY-II Phase-Batch I
ROADS
Sl. No Name of the Work Length
(in Km)
Sanction
Amount
Sanction Date
1 Kuhuboto to Padumpukhuri Jn. Via Henivi. 12.70 1114.86 24.09. 2019
2 T03-Seyochung to Phisami 17.00 1697.00 24.09. 2019
3 MRL01-T-01 to Kezo 19.50 1630.07 24.09. 2019
4 MRL01-T01 (Botsa) to Sendenyu via Tsiemekhuma 19.00 1749.91 24.09. 2019
5 MRL01-T-01 at Dikhu Bridge to Alayong via Yachem 11.40 1103.92 24.09. 2019
6 T06-T-01 (Mongsentyimti) to Chakpa village   1580.52 24.09. 2019
7 T02-T-01 (Langmeang Jn) to Chen Hdq 21.00 1969.18 24.09. 2019
8 T04-T-01 to Lilen via Vonkitem
17.00 1666.07 24.09. 2019
9 T08-Chizami to Sakraba road via Gidemi village 17.00 1617.23 24.09. 2019
10 MRL01-Kuthur to Chassir 21.00 1990.83 24.09. 2019
11 MRL01-Peshu to Kingnyu Jn (Noklak Block) 21.00 2015.75 24.09. 2019
13 T04-Sanis to Lakhuti 18.00 1542.88 24.09. 2019
13 T01-Satakha to Saptiqa 18.00 1,664.02 24.09. 2019
BRIDGES
Sl. No Name of the Work Length
(in Km)
Sanction
Amount
Sanction Date
1 T-01 (Langmeang Jn) to Chen Hdq
Tehong
25.00 359.87 24.09. 2019
2 T-01 (Langmeang Jn) to Chen Hdq
Tehok
25.00 284.4 24.09. 2019
3 T-01 to Lilen via Vonkitem
Gokha
20.50 249.43 24.09. 2019
4 Chizami to Sakraba road via Gidemi village
Tacholeru (Kezeri)
20.50 291.01 24.09. 2019
5 Kuthur to Chassir
Tuntuke
25.00 311.64 24.09. 2019

 